Capacity and flexibility · Sector guide
How capacity markets pay: the price applies only to the share of a unit the market counts
A capacity market pays a price for capacity, but only on the share of a power station or battery that it counts on, and that share is set auction by auction. What the unit keeps then depends on the obligations attached and, in Belgium and Italy, a payback above a strike price.
ListingMinds · Published · Updated and sources verified · Under review
Markets and rounds covered: Great Britain, Belgium, Italy; 5 procurement rounds: 4 closed, 1 open
On this page
A capacity market pays for a promise: that a power station, a battery or another flexible unit will be there when the system is stretched. In Great Britain, Belgium and Italy the payment is a price per unit of capacity per year, and it is made on the capacity the market counts on, not on a unit’s full power. That makes three sets of clauses more telling than the auction price about what a flexible unit earns: the derating that fixes how much of it counts, the obligations attached to the payment and the penalties or payback that can take money back, and the rules on what else it may earn alongside.1, 2, 3, 4, 5
How much of a unit counts, and when that is decided
In Great Britain a unit bids its derated capacity, and its annual payment is that capacity obligation multiplied by the auction’s price, indexed to the consumer prices index for a T-4 auction.1, 2 In Belgium, a unit’s eligible volume is its reference power multiplied by its derating factor.4 Italy states the capacity it awards as derated capacity too.5
The derating factor is the market’s judgement of how much of a unit will be there when it is needed, and it is applied before any price: a unit bids, and is paid on, what the factor leaves of its power. Belgium’s factor for storage with a daily schedule and 4 hours of duration was 49% in its Y-4 auction for delivery period 2029-2030, and is 47% in the Y-4 auction for 2030-2031.6, 7 Great Britain’s T-4 auction for delivery year 2030/31 counts 44.61% of a battery with 4 hours of storage.8, 9, 10
Italy revised its figures for new batteries ahead of its auction for delivery year 2028. ARERA, Italy’s energy regulator, found that the revised proposal of from Terna, the grid operator, met its criteria for that auction only, and states that, other things equal, the revision reduces what new storage can earn through the capacity market. The counted share is therefore not a property of the technology: each market sets it for each auction, and it can move before the auction is held.11
For batteries, the field note One battery, three capacity markets: how much of it counts takes one battery through all three markets, from the share each counts to what the battery keeps once the obligations below apply, and the guide to how battery storage is procured sets capacity markets beside the other routes by which batteries are bought.
What the payment asks in return
Each market attaches conditions to its payment, and they differ in kind. In Great Britain the payment carries a delivery obligation: a unit that falls short when required pays one twenty-fourth of its price for each MWh short, with penalties capped at 200% of the month’s share and 100% of the year’s capacity payment.2 A Belgian unit must show available capacity at least equal to its obligated capacity during availability monitoring or an availability test.4 Italy asks for a standing offer instead: in every market time unit of the delivery period, a contract holder must offer its committed capacity in the day-ahead and intraday markets, and offer whatever is not accepted there in the integrated scheduling process (ISP), subject to exemptions, among them offer constraints set under the grid code and the share of its capacity under planned maintenance.12
Great Britain links no repayment to market prices.2 Belgium has a payback obligation, which applies when the reference price exceeds the strike price.4 Its rules for the 2025 auctions exempted energy storage from it, provided an amendment to the royal decree on the methodology came into force before the bid deadline of . It did, on .13, 14 Version 6 of the rules, of , exempts the delivery points of energy storage from it, as it does those of demand response.4 In Italy, each holder of a capacity contract pays Terna, for each settlement period, any positive difference between the reference price and the strike price on its capacity subject to payback.15 Where a payback applies, a unit gives up the part of the reference price above the strike price on the capacity subject to it; a British unit gives up nothing for high prices, and its exposure is the penalty for falling short.
What else a unit may earn
Elia, Belgium’s transmission system operator, says capacity remuneration comes on top of energy market revenue, and can be combined with revenue from the energy markets and from balancing and redispatching services, but not with other variable subsidies such as green certificates.16 Italy draws a similar line at subsidies: capacity receiving incentives paid by GSE (net metering and dedicated withdrawal included, white certificates and the Conto Termico not) can take part in the auction for delivery year 2028 only if its holder commits to give those incentives up for the whole delivery period. And because of its offer obligation, offering in the energy markets and the ISP is a condition of an Italian capacity contract, not merely allowed beside it.12 Great Britain takes another route: in each settlement period of a system stress event in which a unit provides a relevant balancing service, one listed in the guidelines of the delivery body, the National Energy System Operator (NESO), the obligation it must deliver is reduced by the capacity that service holds back.1
Balancing services are what a system operator buys to keep supply and demand in balance, and they pay on different terms from capacity. NESO’s Balancing Reserve pays every contracted provider an availability payment, at a single clearing price in GBP per MW per hour, for its availability during the service window, and a separate utilisation payment for energy delivered when instructed.17, 18 Elia’s aFRR service pays for capacity awarded, pay-as-bid in euros per MW per hour, and for energy requested, pay-as-cleared in euros per MWh.19
How the price is set
Belgium’s Y-4 auction for delivery period 2029-2030 paid each selected bid its own price; it selected 4,689.57 MW of derated capacity in 65 capacity market units, at a weighted average of EUR 27,333.51 per MW per year.13, 20 Italy’s auction for delivery year 2027 worked the other way: every selected offer was paid the marginal premium, capped at the limit for new or existing capacity, rather than its own bid.15 That premium was EUR 47,000 per MW per year in every area where capacity was awarded, for 38,047 MW of existing and 594 MW of new national capacity.5
Great Britain’s T-1 auction for delivery year 2026/27 cleared at GBP 5 per kW per year on , with capacity agreements for 7,192.317 MW. A weighted average of bids, a single marginal premium and a clearing price are different measures, from auctions for different delivery years, in different currencies and units, and none of them is what a given unit keeps once its derating, obligations and payback apply.21, 22, 23
When the next auctions run
As of , the government says the parameters for Great Britain’s next auctions, the T-1 for delivery year 2027/28 and the T-4 for delivery year 2030/31, may be updated following prequalification and will be confirmed before the auctions are held in early 2027. Those parameters set targets of 5.0 GW for the T-1 and 40.9 GW for the T-4, and the government’s publication page lists no update.8, 9, 10, 24
Belgium runs auctions four, two and one year ahead of delivery (Y-4, Y-2 and Y-1), and a ministerial decree of has Elia organise all three in October 2026.4, 7 Bids were due before then: as of , bids for the Y-4 auction for delivery period 2030-2031 closed on , and Elia publishes the results by at the latest.4, 7, 25
As of , Terna has set Italy’s auction for delivery year 2028 for , with requests to participate accepted from to 12:00 on .26
Reference
| Mechanism | What it pays for | How it is paid | Unit | What triggers delivery |
|---|---|---|---|---|
| Capacity market, Great Britain | Capacity bid as derated capacity | The capacity obligation multiplied by its price, indexed for a T-4 auction | GBP per kW per year | A system stress event |
| Capacity market, Belgium | Contracted capacity, with availability obligations | A remuneration for the contracted capacity | EUR per MW per year | Availability monitoring and availability tests |
| Capacity market, Italy | Capacity awarded, stated as derated capacity | A premium; in the delivery-2027 auction, the marginal premium for every selected offer | EUR per MW per year | An obligation to offer the committed capacity in every market time unit, with exemptions |
| Balancing service: NESO’s Balancing Reserve (example) | Availability in a service window, and energy delivered | An availability payment at a single clearing price, and a utilisation payment | GBP per MW per hour for availability | An instruction from NESO |
| Balancing service: Elia’s aFRR (example) | Capacity awarded, and energy requested | Capacity pay-as-bid; energy pay-as-cleared | EUR per MW per hour; EUR per MWh | A request for energy |
Three capacity markets and two balancing services
- Capacity market, Great Britain
- What it pays forCapacity bid as derated capacity
- How it is paidThe capacity obligation multiplied by its price, indexed for a T-4 auction
- UnitGBP per kW per year
- What triggers deliveryA system stress event
- Capacity market, Belgium
- What it pays forContracted capacity, with availability obligations
- How it is paidA remuneration for the contracted capacity
- UnitEUR per MW per year
- What triggers deliveryAvailability monitoring and availability tests
- Capacity market, Italy
- What it pays forCapacity awarded, stated as derated capacity
- How it is paidA premium; in the delivery-2027 auction, the marginal premium for every selected offer
- UnitEUR per MW per year
- What triggers deliveryAn obligation to offer the committed capacity in every market time unit, with exemptions
- Balancing service: NESO’s Balancing Reserve (example)
- What it pays forAvailability in a service window, and energy delivered
- How it is paidAn availability payment at a single clearing price, and a utilisation payment
- UnitGBP per MW per hour for availability
- What triggers deliveryAn instruction from NESO
- Balancing service: Elia’s aFRR (example)
- What it pays forCapacity awarded, and energy requested
- How it is paidCapacity pay-as-bid; energy pay-as-cleared
- UnitEUR per MW per hour; EUR per MWh
- What triggers deliveryA request for energy
Source: the regulations, rules, contracts and service terms cited below.1, 2, 3, 4, 5, 12, 15, 17, 18, 19, 21, 22, 23
Who may take part
- Great Britain: the legal owner of each generating unit, or its future owner, or, under conditions, its despatch controller, with a copy of its certificate of incorporation and a VAT number, or notice that it has none yet. The unit must be in Great Britain or its offshore area, with a connection capacity of at least 1 MW.1, 2
- Belgium: a legal or a natural person; new-build capacity posts financial security of EUR 20,000 per MW, or EUR 15,000 once it reaches its permitting milestone.4
- Italy, for the auction for delivery year 2028: companies that own, or hold a mandate without representation for, existing or new capacity at units located in Italy and connected directly or indirectly to the national transmission grid, subject to further conditions on those units; Terna asks a company registered outside the EU for an affidavit with its request to participate.12, 26
Where each mechanism is announced
- Great Britain’s Capacity Market: the government’s Capacity Market collection, with the parameter letters, and the delivery body’s Capacity Market page.
- Great Britain’s balancing services: NESO’s balancing services pages.
- Belgium: Elia’s pages on the capacity remuneration mechanism, its auction results and aFRR.
- Italy: Terna’s capacity market pages and its notices to operators.
Sources (26)
- 1
DESNZ: Capacity Market Rules, informal consolidation of · Tier 1 · official · Verified
Where in the document
Rule 1.2, “Bidding Capacity” (p. 15); rules 3.2.3 to 3.2.9 (from p. 74); rule 3.4.1(g) and rule 3.4.2(a) (p. 81); rules 8.5.1 and 8.5.2 (pp. 223–224); Schedule 4 (p. 311). Amendments checked, none changing these rules: Capacity Market (Amendment) Rules 2026; Capacity Market (Amendment) (No. 2) Rules 2026; Capacity Market (Amendment) (No. 3) Rules 2026; Capacity Market (Amendment) (No. 4) Rules 2026.
- 2
The Electricity Capacity Regulations 2014 (SI 2014/2043), legislation.gov.uk, latest revised text · Tier 1 · official · Verified
Where in the document
Regulation 15(3) and 15(4)(a) (location; connection capacity of at least 1 MW); regulation 41(3A) (penalty caps); Schedule 1, paragraphs 3(2), 3(4), 3(5), 5(2A), 5(3), 6(4) and 6(5A). Amendments checked: SI 2025/183 substituted regulation 11(3) before the 2025 prequalification; SI 2026/850 changes none of the cited provisions.
- 3
Elia: CRM Capacity Contract (version of ; English translation, the French and Dutch texts are authentic) · Tier 1 · official · Verified
Where in the document
Article 5.1.2: the Capacity Remuneration “is expressed in euros (€) per MW per year … and covers the Contracted Capacity”.
- 4
Elia: CRM Functioning Rules, version 6 () · Tier 1 · official · Verified
Where in the document
Definitions 20 (Availability Obligations), 65 (Eligible Volume) and 102 (Obligated Capacity); paragraph 81 (p. 66); the timeline table, note 4 (p. 48); section 11.4.1, paragraphs 836 to 839; paragraph 855, section 12.3; paragraph 856 (p. 212).
- 5
Terna: Rendiconto degli esiti, Asta Madre 2027 (results of the capacity auction for delivery year 2027) · Tier 1 · official · Verified
Where in the document
P. 4 (dates, volumes and premiums, stated as derated capacity, “CDP”); Tables 1 and 2 (p. 5).
- 6
Moniteur belge, : ministerial decree of on the volume and parameters for the 2025 auctions of the capacity remuneration mechanism · Tier 1 · official · Verified
Where in the document
Annex 3, “Facteurs de réduction pour l’enchère T-4 2029-2030”, table “Catégorie III: technologies à énergie limitée avec programme journalier”, rows “Stockage/Opslag 2h” and “4h” (printed p. 46468).
- 7
Moniteur belge, : ministerial decree of on the volume and parameters for the 2026 auctions of the capacity remuneration mechanism · Tier 1 · official · Verified
Where in the document
Article 3 (pp. 20572–20573): the T-4, T-2 and T-1 auctions “en octobre 2026”; Annex 3, “Facteurs de réduction pour l’enchère T-4 2030-2031”, table “Catégorie III”, row “Stockage/Opslag 4h” (47) (printed p. 20578).
- 8
NESO, EMR Delivery Body: Capacity Auction Guidelines, T-1 delivery year 2027/28 and T-4 delivery year 2030/31, version 1.0 · Tier 1 · official · Verified
Where in the document
Section 4.3, Table 3, “T-4 %” column, storage classes by minimum duration (pp. 11–12 of 36).
- 9
DESNZ: full details of auction parameters, published · Tier 1 · official · Verified
Where in the document
Table 1 “Auction parameters”, column T-1 2027/28, row “Auction target capacity” (5.0 GW); Table 1, column T-4 2030/31, row “Auction target capacity” (40.9 GW).
- 10
DESNZ: letter to NESO on Capacity Market parameters, · Tier 1 · official · Verified
Where in the document
P. 1, the T-1 target of 5.0 GW; p. 1, “T-4 Auction”: the target of 40.9 GW; p. 2: “the parameters may be updated during the adjustment of the demand curve, taking into account results from auction prequalification”.
- 11
ARERA: deliberation 370/2026/R/eel, conformity of Terna’s proposals for the capacity market’s technical provisions, delivery year 2028 · Tier 1 · official · Verified
Where in the document
P. 10: the paragraph on Terna’s communication of (the storage derating values revised on updated data on authorisations obtained and expected) and the paragraph on new electrochemical storage (the derating revised upward, with a reduction, other things equal, of their remuneration in the capacity market). The decision, point 1 (p. 11): effective for the delivery-2028 auction only.
- 12
Ministry of the Environment and Energy Security (MASE): Disciplina del sistema di remunerazione della disponibilità di capacità produttiva di energia elettrica, Terna’s proposal of , approved for the delivery-2028 auction by decree no. 259 of (annex to the decree) · Tier 1 · official · Verified
Where in the document
Article 4.1(a) and its point IV (printed p. 16 of 96); definition cc, “Incentivi erogati dal GSE”; article 40.1 to 40.3 (printed p. 61 of 96); articles 51.1 and 51.3 (pp. 74–75), worded as in the 2024 rules (S-025). Listed on the decree’s page as “Allegato - Disciplina del Mercato della Capacità”.
- 13
Elia: CRM Functioning Rules, version 5 (), the rules for the 2025 auctions · Tier 1 · official · Verified
Where in the document
Paragraph 371, section 6.3.4 (p. 126): pay-as-bid; paragraph 847: the storage payback exemption and its condition; paragraph 310, section 6.2.2 (p. 116): the bid deadline of . Later version checked: Functioning Rules version 6, of , replaces it for later auctions; the cited paragraphs governed the 2025 auctions.
- 14
Royal decree of amending the royal decree of on the CRM methodology (Moniteur belge, ) · Tier 1 · official · Verified
Where in the document
Article 1 (article 23 §5bis now names delivery points of “stockage d’énergie” and “participation active de la demande”); article 2: in force on the day of its publication in the Moniteur belge, (printed p. 58436).
- 15
Terna: Disciplina del sistema di remunerazione della disponibilità di capacità produttiva, as approved by ministerial decree of and amended on , adapted to the new dispatching code, in force from · Tier 1 · official · Verified
Where in the document
Article 27.3(b) and (c) (p. 44); articles 51.1 (p. 72) and 51.3 (p. 73). Amendment checked: ARERA deliberation 569/2025/R/eel, with its alignment of these rules approved on , applies to contracts only after the delivery-2027 auction, and keeps article 51.1 bis.
- 16
Elia: capacity remuneration mechanism (CRM) page · Tier 1 · official · Verified
Where in the document
Section FAQ, the answer on combining the CRM with energy market revenues; the answer on participating in combination with other variable subsidies.
- 17
National Energy System Operator (NESO): Balancing Reserve service page · Tier 1 · official · Verified
Where in the document
Section headed Getting paid: availability payment (single clearing price, GBP per MW per hour, paid to all contracted providers) and utilisation payment.
- 18
NESO: Balancing Reserve Service Terms, version 2.0, effective from · Tier 1 · official · Verified
Where in the document
Paragraph 9.1 (availability payment at the market clearing price) and paragraph 10.1 (utilisation, per bid offer acceptance) (p. 10).
- 19
Elia: terms and conditions for balancing service providers of aFRR, in force from · Tier 1 · official · Verified
Where in the document
Article II.16, points 1, 2, 4, 6 and 7 (p. 46 of 111).
- 20
Elia: Y-4 auction report for delivery period 2029-2030 · Tier 1 · official · Verified
Where in the document
P. 6 (4,689.57 MW of derated capacity selected, 65 capacity market units); pp. 12 and 13 (weighted average price, EUR per MW per year).
- 21
Department for Energy Security and Net Zero (DESNZ): final auction parameters, T-1 and T-4 Capacity Market auctions · Tier 1 · official · Verified
Where in the document
Table 1 “Final auction parameters”, column T-1 2026/27, row “Auction target capacity” (6.3 GW).
- 22
DESNZ: Capacity Market Auction Monitor Report, 2025 T-1 auction, delivery year 2026/2027 (prepared by Deloitte) · Tier 1 · official · Verified
Where in the document
Section 3, printed p. 6: the auction started on ; the clearing round closed at 13:00 on ; “The Clearing Price … was equal to £5.00”; 7,192.317 MW.
- 23
National Energy System Operator (NESO): “Delivering reliability for GB consumers: the Capacity Market in action” · Tier 1 · official · Verified
Where in the document
Under the heading T-1 Capacity Auction Results: “a Clearing Price of £5/kW/year”.
- 24
Department for Energy Security and Net Zero (DESNZ): Capacity Market auction parameters, letter from DESNZ to NESO of (publication page) · Tier 1 · official · Verified
Where in the document
The summary line and the section headed “Details”, last sentence: the parameters for the two auctions may be updated following auction prequalification and are confirmed before the auctions are held. Two documents listed (the letter of and the full parameters), no change note; read on .
- 25
Elia: CRM auction page · Tier 1 · official · Verified
Where in the document
Under the heading Bid submission: bids are submitted between 15/09 and 30/09; its example is the Y-4 auction for the delivery period starting 2030, with bids in that window of the year 2026. The page also says “Elia publishes the Auction results by 31 October at the latest”.
- 26
Terna: notice to operators, “Asta Madre del Mercato della Capacità con periodo di consegna 2028” · Tier 1 · official · Verified
Where in the document
The body text (the auction date and the two approving decrees) and the table “Le principali scadenze” (requests to participate; the auction); section “Come partecipare”, second paragraph (the affidavit). Publication date ; read on .
ListingMinds uses primary procurement, regulatory and contracting sources wherever available. How we work
How to cite
ListingMinds, “How capacity markets pay: the price applies only to the share of a unit the market counts”, , updated . https://www.listingminds.com/energy/guides/capacity-and-flexibility