Skip to content
ListingMinds
ListingMinds

Hydrogen · Sector guide

How hydrogen support auctions work: the guarantee comes before the money

In the European Hydrogen Bank’s auctions the lowest bids per kilogram win an invitation, not yet a grant: each project must first post a guarantee that can be called if its plant misses its deadlines. Nothing is paid until certified hydrogen is produced; in the second auction, six invited projects signed and 19 withdrew.

ListingMinds · Published · Updated and sources verified

Markets and rounds covered: European Economic Area; 3 procurement rounds, all closed

On this page

Price decides the ranking; the money depends on what the project can show afterwards: first a bank’s guarantee, then certified output. On the European Commission invited 15 projects from the European Hydrogen Bank’s second auction, IF24 (the Innovation Fund 2024 Hydrogen Auction), to prepare grant agreements; between them they had requested EUR 992 million. Each invited project had two months to produce a signed completion guarantee, which takes effect when the grant agreement is signed. The Commission records that several of the 15, in light of that requirement, reassessed their bids and their projects’ maturity and decided not to sign. Ten more projects were then invited from the reserve list, in order of their bid price. On , six projects signed grant agreements for EUR 270.6 million; the Commission’s results table lists the other 19 invited projects as withdrawn.1, 2, 8

When the first results came out, the 12 projects selected in the general topic had bid from EUR 0.20 to EUR 0.60 per kg; the four general-topic projects that signed had bid EUR 0.33, EUR 0.44, EUR 0.84 and EUR 0.85. Two of those four, then, came from the reserve list, at prices above anything first invited in that topic. For a bid ranked outside the budget, the reserve list was a real route to a signed grant agreement.1 The Commission’s questions and answers on the auction say that, as projects dropped out, the auction’s reference clearing price was being increased from the results first communicated in . The Commission’s later draft terms for the fourth auction give the second auction’s clearing price as EUR 0.85 per kg in the general topic, the highest of the four signed general-topic bids, and EUR 1.88 per kg in the maritime topic. The second auction was pay-as-bid, so each project that signed is paid its own bid, not a common price.1, 3, 4, 6

Who may bid, how bids are ranked, and what a win pays

Applicants may be established in any country, but their projects must be in an EU member state or an EEA country. IF25, the third auction, also required at least 75% of a project’s electrolysers, measured by capacity, to originate outside China; for those electrolysers, the stacks had to come from outside China and no more than two main specific components from China.5

In IF25, proposals were ranked by bid price from the lowest; only the proposals whose grant fitted the topic budget (with any national funding) and those needed for a reserve list went on to a pass-or-fail check of relevance and quality, and the rest were rejected. Each winner is paid its own bid, within a ceiling: the second auction was pay-as-bid with a ceiling of EUR 4 per kg, and in the third each payment is the bid price times certified output, with a ceiling of EUR 4.00 per kg in every topic.1, 5, 6, 8

The second and third auctions award a fixed premium per kilogram of certified hydrogen produced, for at most 10 years. The third supported renewable hydrogen and, for the first time, electrolytic low-carbon hydrogen. Renewable has a legal meaning here: under the EU renewable energy directive, renewable fuels of non-biological origin (RFNBOs) are liquid and gaseous fuels whose energy comes from renewable sources other than biomass, and they count only with greenhouse gas emission savings of at least 70%.1, 8, 9

The bid also fixes the most a project can receive: in IF25 the grant requested was the bid price times the expected average yearly volume times 10 years, and the grant awarded could be lower. The terms of the first two auctions state that the support is not indexed. So the premium a bidder names cannot rise with costs, through up to five years before operation and up to 10 years of production; the bid has to allow for them from the start.5, 6, 7 Australia’s Hydrogen Headstart Round 2 shaped its support similarly, as a credit per kilogram of hydrogen, or per unit of derivative, named by the applicant, paid for up to 10 years and not increased for inflation (see our field note on that round).10

Selected is not funded: the guarantee comes first

In IF25, an invitation to prepare a grant agreement was expressly not a formal commitment for funding: checks on the legal entity, its financial capacity and exclusion still had to be made before the grant was awarded. The step with a cost attached is the completion guarantee. In IF25 it was 8% of the requested maximum grant, in euro, issued by an approved bank or financial institution in the EU or EEA with a minimum credit rating; cash blocked in an account was not accepted, and the consortium paid for it. A letter of intent to issue it went in with the proposal, and the guarantee itself was due within two months of the invitation; without it, the application could be treated as withdrawn. The first two auctions’ terms also required that letter with the proposal.5, 6, 7 It runs until six months after the five-year deadline for entering operation, and it is called if the plant misses that deadline, enters operation without its planned capacity, or loses its grant before then, for example by missing financial close within 2.5 years of signing.5

In the first auction, IF23, the guarantee was 4% of the maximum grant and could be called if the project did not reach approved entry into operation within five years of signing. The second auction’s terms raised it from 4% to 8% and added a deadline of 2.5 years from signature to financial close, so that missing either deadline made the guarantee callable.6, 7 In the first auction, six of the seven projects selected signed grant agreements; the seventh chose not to continue, to avoid missing its entry-into-operation deadline.7, 11, 12, 13

The Commission describes the guarantee as a maturity check. Its questions and answers on IF24 say that after selection projects may reassess their bid and maturity, given market conditions, changes to planned off-takers or the availability of infrastructure; some then cannot provide the guarantee in time, and some that could provide it still decide not to sign, because it takes effect only on signature. For a bidder, the two months after an invitation are where the bid is really tested: the price has already been ranked, and what remains is whether the project passes the legal checks, is mature enough for a bank to guarantee its deadlines, and still wants to sign once that guarantee takes effect.3

After signature, the money comes last

In IF25, signature starts two clocks: 2.5 years to reach financial close and 5 years to enter operation with a nameplate capacity equal to the bid. There is no pre-financing, and the first payment follows the first six months of operation. After that, payments come every six months, each the bid price times the verified and certified kilograms produced in the period, up to 140% of half the expected yearly volume. If certified output averages below 30% of the expected yearly volume for three consecutive years, measured over a rolling three-year period, the grant may be terminated and reduced.5

The premium therefore pays for hydrogen produced and certified, not for capacity built: a plant that runs below its bid volume is paid only for what it certifies, and a long shortfall can cost it the grant. Because the grant is sized on 10 years of expected output, a guarantee of 8% of it equals, by our calculation, 0.8 of one year’s expected payments, posted before the plant has produced anything.5

Worked exampleA hypothetical bid under the third auction’s rulesOn these assumptions the project asks for EUR 100,000,000, the most it can receive, must post a guarantee of EUR 8,000,000 within two months of an invitation, and is paid nothing until it has operated for six months; after that, no half-year pays more than EUR 7,000,000.Show the calculation
Worked exampleA hypothetical bid under the third auction’s rulesAn illustration, not a bid: an assumed bid price of EUR 1.00 per kg and an assumed expected average yearly volume of 10,000,000 kg, under the third auction’s rules as its call document states them. Amounts in euros, nominal, not indexed.
Published values
Completion guarantee, share of the requested maximum grant8 %5
Years of expected output the grant requested is sized on10 years5
Most paid for in one half-year, share of half the expected yearly volume140 %5
Floor on certified output, share of the expected yearly volume (rolling three-year average)30 %5
Assumptions
Bid price, per kgEUR 1.00
Expected average yearly volume10,000,000 kg
Calculation
StepCalculationResult
Grant requested, the most the project can receiveEUR 1.00 × 10,000,000 × 10EUR 100,000,000
Completion guarantee, due within two months of an invitationEUR 100,000,000 × 8%EUR 8,000,000
Most paid for any half-year of operationEUR 1.00 × 10,000,000 ÷ 2 × 140%EUR 7,000,000
Average yearly certified output below which the grant may be terminated and reduced10,000,000 kg × 30%3,000,000 kg

Result. On these assumptions the project asks for EUR 100,000,000, the most it can receive, must post a guarantee of EUR 8,000,000 within two months of an invitation, and is paid nothing until it has operated for six months; after that, no half-year pays more than EUR 7,000,000.

Method. The third auction’s call document applied to assumed inputs: the grant requested is the bid price × the expected average yearly volume × 10; the guarantee is 8% of it; each half-year is paid at the bid price on certified output, up to 140% of half the expected yearly volume; the floor is 30% of the expected yearly volume, averaged over three years. Security and payment caps, not costs or returns.

The third auction: 13 projects invited to prepare grant agreements

IF25 offered EUR 1.3 billion in three topics: RFNBO hydrogen, EUR 600 million; RFNBO or electrolytic low-carbon hydrogen, EUR 400 million; and hydrogen for maritime or aviation off-takers, EUR 300 million. It received 58 bids, one of them inadmissible because the project was outside the EEA, and on the Commission selected nine projects in seven countries, almost 1.1 GW, for around EUR 1.09 billion. In June 2026 it invited four more from the reserve list, for EUR 147.73 million and 77 MW, bringing the total to 13 and covering more than 95% of the budget.5, 8, 14

Member states can add money of their own through auctions-as-a-service: national budgets support projects on their territory that applied to the EU auction, and reserve-list projects within those budgets, taken in the overall ranking order, may be passed to national authorities to prepare their grant agreements. The Commission’s release on the results said that, for IF25, Germany would support RFNBO projects with up to EUR 1.3 billion and Spain would contribute up to EUR 440 million. A project in a participating member state that ranks below the EU budget can therefore still be passed to its national authorities to prepare a grant agreement, in ranking order and within the national budget.14

As of , the Commission’s IF25 page, last updated on , listed all 13 projects as invited to grant agreement preparation, with signature expected from September to .8 Its European Hydrogen Bank page said, as of , that the grant agreements are expected to be signed with the European Climate, Infrastructure and Environment Executive Agency (CINEA) in the last quarter of 2026. Until those agreements are signed, the IF25 results are a ranking with invitations attached, not a funding total.15

The fourth auction: the same guarantee, in draft

As of , the Commission’s IF26 page said the fourth European Hydrogen Bank auction is planned to open in and close in , with a planned budget of EUR 500 million in two topics, RFNBO hydrogen and RFNBO or electrolytic low-carbon hydrogen. Its draft terms and conditions of propose keeping the third auction’s main obligations: payment only on verified and certified production, for at most 10 years and without indexation; 2.5 years to financial close and 5 years to entry into operation; and a ceiling of EUR 4 per kg. They also propose the same completion guarantee, 8% of the maximum grant, with the guarantee itself due within two months of an invitation. They are a draft: only the call documents will bind the Commission, and the final terms are to be published when the call opens. As in every auction so far, the draft puts the bank in the bid itself: a letter of intent from a bank or financial institution to issue the guarantee goes in with the proposal, before any price is ranked.4, 16

Reference: the three auctions

The first three European Hydrogen Bank auctions
AuctionCeiling priceCompletion guaranteeBidsFirst selected or invitedSigned grant agreements
First auction (IF23)EUR 4.50 per kg4% of the maximum grant1327 projects, nearly EUR 720 million6 projects, EUR 694,521,237
Second auction (IF24)EUR 4 per kg8% of the maximum grant6115 projects, EUR 992 million requested; 10 more from the reserve list6 projects, EUR 270.6 million; 19 invited projects withdrawn
Third auction (IF25)EUR 4.00 per kg8% of the requested maximum grant589 projects, around EUR 1.09 billion; 4 more from the reserve listNone recorded on the Commission’s IF25 page when this guide’s sources were verified; all 13 listed as invited to grant agreement preparation (see the text)

Source: the European Commission’s auction pages, terms, call document and press releases, cited below.1, 2, 5, 6, 7, 8, 11, 12, 13, 14

Each auction’s page on the European Commission’s climate action website carries its terms, timeline and results, and the call documents sit on the EU’s funding and tenders portal.

Sources (16)

  1. 1

    European Commission: Innovation Fund, the second European Hydrogen Bank auction (IF24) · Tier 1 · official · Verified

    Where in the document

    Background section; timeline entries of , , (the 12 general-topic projects, bids €0.20 to €0.60 per kg), and ; section “Projects Invited to Grant Agreement Preparation (GAP)”, paragraphs 2 and 3 (the two-month completion guarantee, activated at signature; projects reassessing and not signing); results section and results table, “Status” and “Bid price (EUR/kg)” columns. Read again on ; the page gives its last update as .

  2. 2

    European Commission: press release IP/25/1264 on the IF24 results · Tier 1 · official · Verified

    Where in the document

    Paragraph one of the release: 15 projects invited, “a total of €992 million in EU funding”.

  3. 3

    European Commission: questions and answers on the IF24 hydrogen auction, projects not signing their grant agreements · Tier 1 · official · Verified

    Where in the document

    Three pages; the document shows no date (PDF created ); linked from the IF24 page’s GAP section (S-077). First answer (p. 1): the completion guarantee, 8% of the total grant amount requested, a maturity check; reasons projects reassess; projects able to provide the guarantee not signing, as it is activated only at signature. Second answer, last paragraph (p. 2): the reference clearing price increased compared with the initial results of . Third answer (p. 2): no funding disbursed until projects start producing certified and verified RFNBO hydrogen.

  4. 4

    European Commission (DG Climate Action): Innovation Fund IF26 Hydrogen Auction, draft terms and conditions, version 1.0 · Tier 1 · official · Verified

    Where in the document

    Dated , version 1.0; linked from the IF26 page (S-646). The PDF prints no page numbers; pages are the PDF’s. Section I, background (pp. 3–4): the second auction's clearing prices; section II, introduction and footnote 9 (p. 5): final terms published at call opening; only the call documents binding. Table 1, 1.3 (p. 6), 1.10 and 1.11 (p. 7); Table 2, 2.2 completion guarantee (p. 11) and 3.6 ceiling price (p. 13); Table 3, 4.1 maximum times to financial close and entry into operation (p. 14).

  5. 5

    European Commission (CINEA): call document INNOVFUND-2025-AUC-H2, version 1.2 of · Tier 1 · official · Verified

    Where in the document

    Version 1.2 of ; printed page = PDF page. Eligibility of the project (p. 12); eligibility of participants (p. 15); geographic location and duration (p. 16); project budget and ceiling price, EUR 4.00 per kg (p. 17); section 8, the ranking cascade and “No commitment for funding” (p. 20); award criteria, section 9 (p. 22), the electrolyser origin rule; section 10, grant form, units and the 140% cap (pp. 26–27), the 30% floor (p. 27), payments (p. 28) and the completion guarantee (p. 30); the declaration of origin (p. 42). Read again on .

  6. 6

    European Commission: IF24 auction terms and conditions, version 0.2 · Tier 1 · official · Verified

    Where in the document

    Point 1.12, indexation of support, “No indexation” (PDF p. 6); point 2.2, completion guarantee, 8% of the maximum grant amount, with its “Change from IF23 Auction” column (4% to 8%; financial close within 2.5 years) and the call conditions (PDF pp. 10–11); point 3.4, pricing rules (pay-as-bid), and point 3.6, ceiling price (EUR 4 per kg, reduced from EUR 4.5) (p. 12).

  7. 7

    European Commission: terms and conditions of the first Innovation Fund auction for renewable hydrogen (IF23), version 0.1 · Tier 1 · official · Verified

    Where in the document

    Point 1.12, indexation, “No indexation” (p. 5); point 2.2, completion guarantee, 4% of the maximum grant amount, called if no approved entry into operation within five years of signature (p. 6); point 3.7, disclosed ceiling price of EUR 4.50 per kg (p. 8).

  8. 8

    European Commission: Innovation Fund, the third European Hydrogen Bank auction (IF25) · Tier 1 · official · Verified

    Where in the document

    Design section (the topics and their budgets); results tables (“Invited to GAP”); timeline entries of , on the reserve list, and on the expected grant agreement signature.

  9. 9

    EUR-Lex: Directive (EU) 2023/2413 amending the renewable energy directive · Tier 1 · official · Verified

    Where in the document

    Article 1, point (g) (new article 2, point 36, definition of renewable fuels of non-biological origin) and the new article 29a(1) (savings of at least 70%).

  10. 10

    Australian Renewable Energy Agency (ARENA): Hydrogen Headstart Round 2, Program Guidelines · Tier 1 · official · Verified

    Where in the document

    Dated on the cover; commencing on (cl. 1.18). The cover is printed “Page 0 of 34”, so each printed page is the PDF page minus one; printed pages are given, with the PDF page. Cl. 1.2 and 1.3 (p. 4); cl. 1.10 to 1.12 (p. 5); cl. 1.14 (p. 6); cl. 2.1, the timetable, cl. 2.2 and cl. 2.3 (p. 7); Part 3, Eligibility Criteria A and B (pp. 8–9); cl. 4.3 and the Part 4 headings (pp. 11–13); Merit Criterion D (p. 13); cl. 5.9 (p. 14); cl. 6.1 to 6.3, 6.5, 6.6, 6.8 and 6.9 (p. 18); cl. 7.4 and 7.5 (p. 19); Appendix A, A.1 to A.3 (pp. 23–24) and A.11 and A.12 (p. 25); glossary, “Grant” (p. 33) and “Total Funding Allocation” (p. 34). Amendments checked: this is the only Guidelines file linked from ARENA’s Round 2 page on ; no amended Guidelines, clarification or published FAQ was found there, although cl. 1.19 and 5.12 allow ARENA to amend the Guidelines after the EOI stage; ARENA’s outcome letters to shortlisted applicants (cl. 5.11) are not public. Later statements: ARENA’s release of (S-214) revised the program’s funding to $1 billion and moved the Full Application date to early ; it does not reissue or amend the Guidelines. The template Funding Agreement (cl. 7.1) is not on the Round 2 page.

  11. 11

    European Commission: press release IP/24/2333 on the first hydrogen auction results · Tier 1 · official · Verified

    Where in the document

    Paragraph one of the release: “nearly €720 million to seven renewable hydrogen projects”.

  12. 12

    European Commission: news, winners of the first hydrogen auction sign grant agreements · Tier 1 · official · Verified

    Where in the document

    Paragraph one of the news item: “six out of those seven projects have signed”, EUR 694,521,237.

  13. 13

    European Commission: Innovation Fund, the first hydrogen auction (IF23) · Tier 1 · official · Verified

    Where in the document

    Section Results: the seventh project “chose not to continue with the process to avoid failing to meet the entry-into-operation deadline”; the timeline entry of : 132 bids, 119 eligible and admissible, ranked from the lowest bid.

  14. 14

    European Commission: press release IP/26/1004 on the IF25 results · Tier 1 · official · Verified

    Where in the document

    Paragraphs of the release: nine projects, almost 1.1 GW, around EUR 1.09 billion; Germany up to EUR 1.3 billion and Spain up to EUR 440 million through auctions-as-a-service.

  15. 15

    European Commission (DG Energy): European Hydrogen Bank · Tier 1 · official · Verified

    Where in the document

    Section “European Hydrogen Bank auctions”, the paragraph on the third auction: the 13 selected projects and the expected signature of grant agreements with CINEA “in the last quarter of 2026”. The page shows no date; its embedded metadata gives a last modification on .

  16. 16

    European Commission: Innovation Fund, the fourth European Hydrogen Bank auction (IF26) · Tier 1 · official · Verified

    Where in the document

    The page shows no date; its embedded metadata gives publication and last modification on . Sections “Objective” (start planned for , planned budget EUR 500 million, two topics), “Design” (draft terms published ; the two topics) and “Timeline” (call planned to open in and close in ), read on .

ListingMinds uses primary procurement, regulatory and contracting sources wherever available. How we work

How to cite

ListingMinds, “How hydrogen support auctions work: the guarantee comes before the money”, , updated . https://www.listingminds.com/energy/guides/hydrogen

Decide which tenders are worth bidding for.

We'll email you once when access opens.

We'll send a confirmation link to this address. Nothing else is sent until you confirm.

Read our privacy notice.