Roads, bridges and tunnels · Sector guide

Buy America and DBE: how federal money sets the rules on US transport bids

On US highway, transit and airport contracts, Buy America and DBE rules come with the federal money, and the funding source picks the domestic-content test. A manufactured product that meets the highway test, at more than 55% US component cost, can still need a waiver on a transit or airport contract.

ListingMinds · Published and updated · Sources verified · Reviewed

Markets and rounds covered: United States

On this page

On a US highway, transit or airport contract, the federal rules on what a supplier may install and whether Disadvantaged Business Enterprise (DBE) subcontracting goals apply come with the federal money in the project. On highway work, even two bids for similar work in the same state can face different tests, depending on when each project was obligated. As of , federal rules bar DBE contract goals wherever the certifying programme that covers the buyer has not finished reevaluating its DBE firms.1, 17

An advertisement does not always say where the money comes from. The Port Authority of New York and New Jersey’s advertisement for rehabilitating Runway 13-31 at LaGuardia Airport, work that includes replacing lighting, guidance signage and sensor systems, had bids due on . It said that the project may be federally funded and left the federal provisions to the solicitation and the resulting contract.2 On federal-aid highway projects the reach is wider still. Once one contract in a project is funded under title 23 of the US Code, Buy America applies to every contract in the project that is eligible for that assistance and within the scope of its environmental review, whatever pays for it.3 A package paid for entirely with state or local money can therefore carry the federal domestic-content test because another contract in the same project carries title 23 money.

Four domestic-content rules, and the funding decides which applies

Federal-aid highway funds under title 23 may be obligated for a project only if the steel, iron and manufactured products used in it are produced in the United States.3 For iron and steel, the Federal Highway Administration (FHWA) requires every manufacturing process, coating included, to take place in the United States. An item is classed as it is brought to the work site: one whose iron and steel content costs more than 50% of all its components is an iron or steel product under that rule, not a manufactured product.4

Manufactured products are the recent change: FHWA’s rule of ended a general waiver for them that had been in place since 1983 and stayed in force until .5 For projects obligated from , a manufactured product must be manufactured in the United States. For projects obligated from , the cost of its components mined, produced or manufactured in the United States must also be more than 55% of the cost of all its components. In that test, a bought-in component counts at its acquisition cost, with transport to where it is incorporated into the product and any duty, and a component the manufacturer makes itself counts at its cost plus allocable overhead, without profit.4 On design-build and other alternative delivery contracts, the obligation of the construction phase decides, even where preconstruction work was funded earlier.5

Some steel inside manufactured products is held to the iron and steel rule as well. That covers the iron or steel parts of precast concrete products, and the cabinets of intelligent transportation systems (ITS) and other electronic hardware in the highway right of way, where they are wholly or mostly iron or steel. Their cost still counts in the product’s 55% test.4

A second statute fills the gaps. The Build America, Buy America Act (BABA) makes every federal agency apply a Buy America preference to infrastructure programmes for each category of product not already covered, so FHWA’s guidance applies it to construction materials, which FHWA’s own statute does not cover.6 The government-wide rule at 2 CFR part 184 lists those materials: non-ferrous metals, plastic and polymer-based products, glass, fibre optic cable, optical fibre, lumber, engineered wood and drywall. Each counts as produced in the United States only if all its manufacturing processes took place there. The preference must flow down into every subaward, contract and purchase order under the federal award.7

Transit grants carry their own statute: Federal Transit Administration (FTA) funds may be obligated only if the steel, iron and manufactured goods used in the project are produced in the United States.8 Under FTA’s regulation, steel and iron, including structural steel, running rail and contact rail, need every manufacturing process in the United States except the metallurgical refinement of steel additives. A manufactured product needs all its manufacturing processes there and all its components of US origin; a component counts as US if it is manufactured in the United States, wherever its subcomponents come from.9 Rolling stock, including train control, communication and traction power equipment, has its own route: the general rule may be waived where US components and subcomponents make up more than 70% of the cost of all components and final assembly takes place in the United States.8

Airport grants carry their own statute too: Airport Improvement Program (AIP) funds may be used only if the steel and manufactured goods in the project are produced in the United States. The rule may be waived for a facility or equipment whose US components and subcomponents make up more than 60% of the cost of all components, with final assembly in the United States; the labour of final assembly does not count as component cost.10 Grant recipients certify that the steel and manufactured products on any part of an AIP-funded project are produced in the United States and of 100% US materials; equipment on the FAA’s Buy American Conformance List of nationwide waivers needs no request of its own.11 According to its fact sheet (page last updated ), the FAA applies the statute together with BABA, so construction materials are covered too.12

Read side by side, the percentages do different jobs. On federal-aid highway projects and under BABA, a US share of more than 55% of component cost is part of what ‘produced in the United States’ means. For FTA rolling stock (70%) and FAA facilities and equipment (60%), the percentage is a ground on which the agency may waive a stricter general rule.

Every regime has waivers, and every one has a 25% cost test

All four regimes allow waivers in the public interest and for products not produced in the United States in sufficient and reasonably available quantities or of satisfactory quality. All four also have a cost test: domestic material raising the cost of the overall project, for highways the overall project contract, by more than 25%.3, 7, 8, 10 FTA’s regulation applies its test to the contract between the grantee and its supplier of the item. It grants the waiver if the lowest responsive and responsible bid offering a foreign item, multiplied by 1.25, is less than the lowest such bid offering a US item.9 Highway buyers can settle the iron and steel question inside the bid too. Under alternate bid provisions every bidder prices domestic iron and steel, and the lowest domestic bid wins unless it is more than 25% above the lowest bid based on foreign iron and steel.4 In both, the 25% margin is measured between the bids themselves.

Under BABA, recipients request waivers in writing, and a waiver becomes final only after the agency has published it with its reasons for at least 15 calendar days of public comment.7 A highway waiver needs at least 15 days’ public notice before it is issued, and a waiver under the airport statute must be posted with its justification for comment at least 10 days before it takes effect.3, 10 FTA presumes a non-availability waiver justified if no responsive and responsible bid offers a US-produced item. After award, it may grant one where a bidder certified in good faith but the item can no longer be obtained domestically, for reasons of commercial impossibility or impracticability.9

Small amounts and small projects have their own waiver, which the Department of Transportation issued under BABA and under the highway, transit and airport statutes alike.13 On FHWA projects its de minimis part covers manufactured products and construction materials only; iron and steel stay under FHWA’s own minimal-use allowance, including the steel in precast concrete and in ITS cabinets.14 None of this caps what a state may demand: it may impose stricter domestic-content requirements on highway and transit projects it carries out with federal assistance.3, 8

Federal-aid highway work is let without geographic preference

Federal-aid highway construction is let by competitive bidding, free, open and adequately advertised, unless the state department of transportation shows FHWA that another method is more cost effective or that an emergency exists. Design-build, construction manager/general contractor (CM/GC) and indefinite delivery/indefinite quantity (ID/IQ) contracts need no cost justification.15

The state may not use bonding, licensing or qualification rules to keep out a responsible contractor from inside or outside the state. No licence can be required before a bid is submitted or considered, though one may be required at or after award, and prequalification can be a condition for bidding or for award only if the bidding period leaves time to obtain the rating. The advertisement and plans must be available at least 3 weeks before bid opening, unless a shorter period is approved in special cases. Bidding must be open to qualified bidders regardless of national, state or local boundaries, and where a state provision would block a bid, the notice has to say that it does not apply. On a conventionally let contract, what remains for a firm from another state or another country is the qualification itself: a prequalification rating where the state requires one, and a licence at or after award.15

Design-build, CM/GC and ID/IQ procurements work differently: the state may use its own bonding, licensing, qualification or prequalification procedures at any phase, though licensing may not bar an otherwise responsive proposal from consideration, and can make state or local licensing a condition of award. No in-state or local preference may enter at any stage, and an office’s location cannot be a selection criterion, though a successful design-builder can be required to open a local office after award.15

Engineering and design consultants on federal-aid highway projects are chosen on qualifications under the Brooks Act: price may not be used to evaluate, rank or select them, and cost proposals are submitted concealed and separately. Out-of-state consultants must get a fair opportunity, though a licence in the state can be a minimum qualification, and a local presence and certified DBE subconsultants may together carry no more than 10% of the evaluation.16

How state departments of transportation run prequalification in practice is the subject of our guide to how road authorities buy works.

DBE eligibility is now proved firm by firm, and contract goals wait for each certifier’s reevaluation

The DBE rule binds recipients of federal highway, transit and airport funds, each of which sets an overall DBE goal, and it does not reach a contract with no Department of Transportation (DOT) money in it.1

An interim final rule of , effective the same day, removed the race- and sex-based presumptions of disadvantage and required every firm, including those already certified, to prove disadvantage individually. It also required the Unified Certification Programs (UCPs) that certify DBEs to reevaluate every certified firm.1, 17, 18 Until the UCP covering a recipient finishes, the recipient may not set contract goals or count DBE participation towards its goals.1, 17 The final rule of , also effective on publication, follows the interim rule with few modifications; the Department said it saw no alternative to pausing the goal system until only firms that meet the new requirements can take part.18 It set a deadline: each UCP must finish by , with a one-time extension of up to 90 days if requested in advance and granted for good cause. A UCP that finishes must promptly email the Department and, within three business days, send a copy to every recipient of DOT funding in its jurisdiction.1, 18

As of , the electronic Code of Federal Regulations shows both prohibitions in force.1, 17 For each buyer the bar lifts when its UCP finishes, and the UCP’s copy of its completion notice is what tells the buyer so. Commenters on the interim rule told the Department that the pause had led prime contractors to drop DBE subcontractors from their teams.18 Once that bar lifts, a contract that carries a goal is awarded only to a bidder that documents enough DBE participation, or adequate good-faith efforts to reach it. A team formed without DBE firms during the pause is measured against the goal again on the first contract that sets one.

Domestic-content rules by funding source

Domestic-content rules on US transport projects, by funding source
Funding sourceRuleWhat counts as produced in the United StatesThresholds and waiver routes
Federal-aid highways (FHWA, title 23 funds)23 U.S.C. 313; 23 CFR 635.410Iron and steel products (iron and steel content more than 50% of component cost, judged at the work site): every manufacturing process, coating included, in the United States. Manufactured products: manufactured in the United States for projects obligated from ; also more than 55% US component cost for projects obligated from Foreign iron or steel up to 0.1% of total contract cost or $2,500, whichever is greater; alternate bids: the lowest domestic bid wins unless more than 25% above the lowest foreign bid; waivers in the public interest, for non-availability, or where domestic material adds more than 25% to the overall project contract, after at least 15 days’ public notice; the DOT de minimis waiver for manufactured products and construction materials, and its small-grants waiver for projects with less than $500,000 of federal assistance (see BABA row)
Federal awards for infrastructure, for categories no older rule covers (on federal-aid highways: construction materials)Build America, Buy America Act; 2 CFR part 184Construction materials: every manufacturing process in the United States. Manufactured products: manufactured in the United States, with more than 55% US component costDOT de minimis and small-grants waiver, for awards obligated from , also under the highway, transit and airport statutes: non-compliant products totalling no more than the lesser of $1,000,000 or 5% of total applicable costs (not iron and steel on FHWA projects), or projects with less than $500,000 of federal assistance; not for products under two separate product-specific DOT waivers. Waivers in the public interest, for non-availability, or where US products add more than 25% to the overall project: requested by the recipient in writing, final after at least 15 days’ comment
Transit (FTA funds)49 U.S.C. 5323(j); 49 CFR part 661Steel and iron: every manufacturing process in the United States, except refining steel additives. Manufactured products: every manufacturing process in the United States and every component of US originRolling stock, including train control, communication and traction power equipment: more than 70% US component and subcomponent cost and final assembly in the United States; price-differential waiver if the lowest responsive and responsible bid offering a foreign item, multiplied by 1.25, is below the lowest such bid offering a US item (regulation; the statute words the test on the overall project); general public-interest waiver for small purchases of up to $150,000; the DOT de minimis and small-grants waiver (see BABA row)
Airports (FAA, AIP funds)49 U.S.C. 50101; with the Build America, Buy America ActSteel and manufactured goods produced in the United States; recipients certify 100% US materialsFacilities and equipment: more than 60% US component and subcomponent cost, without the labour of final assembly, and final assembly in the United States; waivers where domestic material adds more than 25% to the overall project; waivers under the airport statute posted for comment at least 10 days before they take effect; if a bid is not 100% domestic, the applicant contacts the FAA within 15 days of becoming the winning bidder to seek a waiver (fact sheet, page last updated ); the DOT de minimis and small-grants waiver (see BABA row)

Source: the statutes, regulations, rules and guidance cited below, in the versions the source list names.3, 4, 6, 7, 8, 9, 10, 11, 12, 13, 14

Sources (18)

  1. 1

    Office of the Federal Register and Government Publishing Office, eCFR: 49 CFR part 26, Participation by Disadvantaged Business Enterprises in Department of Transportation financial assistance programs, text up to date as of · Tier 1 · official · Verified

    Where in the document

    Sections 26.3(a) and (d); 26.45(a)(1) and (b); 26.51(h) (source note “90 FR 47981, Oct. 3, 2025”); 26.53(a); 26.55(i) (source note “90 FR 47982, Oct. 3, 2025”); 26.111(a), (c), (c)(1) and (c)(2) (source note “90 FR 47982, Oct. 3, 2025, as amended at 91 FR 60900, Sept. 25, 2026”). Read through the eCFR versioner API (date 2026-10-28); the eCFR version list shows no amendment to 26.51 or 26.55 after . Address: the eCFR renderer API’s point-in-time text as of (the title’s “up to date as of” date on 2026-10-30), chosen because it answers plain requests; the human-readable eCFR page, https://www.ecfr.gov/current/title-49/subtitle-A/part-26, sends automated requests (and the coordinator’s browser) to a bot-verification page, which is not bypassed. GovInfo’s annual CFR edition was not used: GovInfo’s title 49 edition revised as of predates both DBE rules, so only the eCFR shows the part in force; the same address type is used for every regulation this guide cites.

  2. 2

    The Port Authority of New York and New Jersey: Advertisement, Contract LGA-124.877, LaGuardia Airport, Rehabilitation of Runway 13-31 and Associated Taxiways (bids due ) · Tier 1 · official · Verified

    Where in the document

    Page A, the contract paragraph (“This project may be federally funded in whole or in part …”); pages A to A1, the paragraph beginning “As a condition of a grant award” (FAA assurances). The PDF shows no issue date.

  3. 3

    Office of the Law Revision Counsel, US House of Representatives: United States Code, 23 U.S.C. 313, Buy America, text in effect through Public Law 119-136 () (uscode.house.gov) · Tier 1 · official · Verified

    Where in the document

    Section 313, subsections (a), (b)(1) to (3), (d), (g)(1) and (h); last amended by Pub. L. 117–58, section 11513 (subsections (g) and (h)); the amendment notes list no later change. Address: the Office of the Law Revision Counsel’s section page pinned to release point 119-136, which states “Text contains those laws in effect through Public Law 119-136 (October 22, 2026)” and answers plain requests. GovInfo’s 2024 edition (https://www.govinfo.gov/content/pkg/USCODE-2024-title23/html/USCODE-2024-title23-chap3-sec313.htm, current through by its own metadata) carries the same text; it was the first reading. A statutory note (Pub. L. 119-75, div. D, title I, section 122, ) repeats the yearly appropriations condition of 15 days’ informal notice before a highway waiver; not used.

  4. 4

    Office of the Federal Register and Government Publishing Office, eCFR: 23 CFR 635.410, Buy America requirements (Federal Highway Administration), text up to date as of · Tier 1 · official · Verified

    Where in the document

    Paragraphs (b)(1), (b)(3), (b)(4); (c)(1)(iii), (iv), (vi) and (vii)(A) and (B); (c)(2), (c)(2)(i) and (ii); (c)(3)(i) and (ii). Source note: “48 FR 53104, Nov. 25, 1983, as amended … 90 FR 2957, Jan. 14, 2025”. Read through the eCFR versioner API (https://www.ecfr.gov/api/versioner/v1/full/2026-10-28/title-23.xml?part=635&section=635.410); no amendment to part 635 after (eCFR version list). Address: the eCFR renderer API’s point-in-time text as of (the title’s “up to date as of” date on 2026-10-30), chosen because it answers plain requests; the human-readable eCFR page, https://www.ecfr.gov/current/title-23/chapter-I/subchapter-G/part-635/subpart-D/section-635.410, sends automated requests (and the coordinator’s browser) to a bot-verification page, which is not bypassed. GovInfo’s annual CFR edition was not used: the eCFR’s dated text is the one every row was checked against, and one address type serves every regulation this guide cites.

  5. 5

    Federal Highway Administration: Buy America Requirements for Manufactured Products, final rule, 90 FR 2932, (Federal Register via GovInfo) · Tier 1 · official · Verified

    Where in the document

    Summary and executive summary (pp. 2932–2933: termination of the Manufactured Products General Waiver of 1983; final assembly requirement for projects obligated on or after October 1, 2025, the waiver remaining in place until that date; 55 percent requirement for projects obligated on or after October 1, 2026); FHWA response on start dates (p. 2944) and on alternate delivery methods (p. 2945). The effective date was later delayed to (90 FR 11139, ); the start dates were not changed.

  6. 6

    Federal Highway Administration: On or After March 20, 2025: Q&As for Infrastructure Investment and Jobs Act - Build America, Buy America Act and the Implementation of the OMB Final Guidance in 2 CFR Parts 184 and 200, updated · Tier 1 · official · Verified

    Where in the document

    Questions 1, 2 and 3 (p. 1). Linked from FHWA’s “Buy America Q and A for Federal-aid Program” page (https://www.fhwa.dot.gov/construction/contracts/buyam_qa.cfm). The document states it does not have the force and effect of law except for the statutes and regulations cited.

  7. 7

    Office of the Federal Register and Government Publishing Office, eCFR: 2 CFR part 184, Buy America preferences for infrastructure projects (Office of Management and Budget), text up to date as of · Tier 1 · official · Verified

    Where in the document

    Sections 184.1(b); 184.3, definitions of “Construction materials” and “Produced in the United States”; 184.4(b) and (c); 184.6(a); 184.7(a), (b), (d) and (e). Read through the eCFR versioner API (date 2026-10-28); last amended (89 FR 79732). Address: the eCFR renderer API’s point-in-time text as of (the title’s “up to date as of” date on 2026-10-30), chosen because it answers plain requests; the human-readable eCFR page, https://www.ecfr.gov/current/title-2/subtitle-A/chapter-I/part-184, sends automated requests (and the coordinator’s browser) to a bot-verification page, which is not bypassed. GovInfo’s annual CFR edition was not used: the eCFR’s dated text is the one every row was checked against, and one address type serves every regulation this guide cites.

  8. 8

    Office of the Law Revision Counsel, US House of Representatives: United States Code, 49 U.S.C. 5323, General provisions, subsection (j), Buy America, text in effect through Public Law 119-136 () (uscode.house.gov) · Tier 1 · official · Verified

    Where in the document

    Section 5323, subsections (j)(1), (j)(2)(A) to (D), (j)(9) and (j)(13); last amended by Pub. L. 117–58, outside the cited paragraphs; the amendment notes list no later change. Address: the Office of the Law Revision Counsel’s section page pinned to release point 119-136, which states “Text contains those laws in effect through Public Law 119-136 (October 22, 2026)” and answers plain requests. GovInfo’s 2024 edition (https://www.govinfo.gov/content/pkg/USCODE-2024-title49/html/USCODE-2024-title49-subtitleIII-chap53-sec5323.htm, current through by its own metadata) carries the same text; it was the first reading.

  9. 9

    Office of the Federal Register and Government Publishing Office, eCFR: 49 CFR part 661, Buy America requirements (Federal Transit Administration), text up to date as of · Tier 1 · official · Verified

    Where in the document

    Section 661.5(b), (c) and (d); section 661.7(c)(1) and (3) and (d). Read through the eCFR versioner API (date 2026-10-28); part 661 last amended 2018-05-30. Section 661.11(a) still prints the earlier 60 percent rolling-stock figure; the piece takes the rolling-stock threshold from the statute (S-1091), which sets more than 70 percent for fiscal year 2020 and after (conflict X-058). Section 661.7(d) words the 25 percent test on the supplier contract, the statute on the overall project (conflict X-059). Address: the eCFR renderer API’s point-in-time text as of (the title’s “up to date as of” date on 2026-10-30), chosen because it answers plain requests; the human-readable eCFR page, https://www.ecfr.gov/current/title-49/subtitle-B/chapter-VI/part-661, sends automated requests (and the coordinator’s browser) to a bot-verification page, which is not bypassed. GovInfo’s annual CFR edition was not used: the eCFR’s dated text is the one every row was checked against, and one address type serves every regulation this guide cites.

  10. 10

    Office of the Law Revision Counsel, US House of Representatives: United States Code, 49 U.S.C. 50101, Buying goods produced in the United States, text in effect through Public Law 119-136 () (uscode.house.gov) · Tier 1 · official · Verified

    Where in the document

    Section 50101, subsections (a), (b)(1) to (4) and (c), amended by Pub. L. 118–63, section 768(a), (which also added subsection (d), not used); and the statutory note “Buy America Requirements” (Pub. L. 115-254, div. B, title I, section 167(a)): the 10-day notice before a waiver takes effect. Address: the Office of the Law Revision Counsel’s section page pinned to release point 119-136, which states “Text contains those laws in effect through Public Law 119-136 (October 22, 2026)” and answers plain requests. GovInfo’s 2024 edition (https://www.govinfo.gov/content/pkg/USCODE-2024-title49/html/USCODE-2024-title49-subtitleVII-partE-chap501-sec50101.htm, current through by its own metadata) carries the same text; it was the first reading.

  11. 11

    Federal Aviation Administration: Buy American Preference Requirements (Airport Improvement Program), last updated · Tier 1 · official · Verified

    Where in the document

    Opening paragraph (the certification and the four waiver grounds under 49 U.S.C. 50101(b)) and the section “Buy American Waivers” (the Buy American Conformance List of nationwide waivers).

  12. 12

    Federal Aviation Administration: FAA Buy American Preference, BABA Implementation Fact Sheet (PDF; its page last updated ) · Tier 1 · official · Verified

    Where in the document

    Paragraphs 1 to 4 (the combined requirements; the bid certification and the 15-day contact; project-specific waivers; the 10-day posting). Linked from https://www.faa.gov/airports/aip/buy_american/baba_implementation_fact_sheet.

  13. 13

    Department of Transportation, Office of the Secretary: Waiver of Buy America Requirements for De Minimis Costs and Small Grants, notice, 88 FR 55817, (Federal Register via GovInfo) · Tier 1 · official · Verified

    Where in the document

    Summary and dates (p. 55817: “The waiver is applicable to awards that are obligated on or after August 16, 2023”); the waiver’s terms (the lesser of $1,000,000 or 5% of total applicable costs; federal financial assistance below $500,000); the section “Finding on the Waiver” (a waiver of BABA’s domestic preferences, also an exercise of DOT’s waiver authority under 23 U.S.C. 313(b)(1), 49 U.S.C. 5323(j) and 49 U.S.C. 50101(b)(1), among others; its de minimis part not for iron and steel under 23 U.S.C. 313 on FHWA-administered assistance; not for products under two separate product-specific waivers).

  14. 14

    Federal Highway Administration: Q&As for the Waiver of Buy America Requirements for De Minimis Costs and Small Grants on or After October 1, 2025, updated · Tier 1 · official · Verified

    Where in the document

    Question 1 (p. 1). Linked from FHWA’s “Buy America Q and A for Federal-aid Program” page.

  15. 15

    Office of the Federal Register and Government Publishing Office, eCFR: 23 CFR part 635 subpart A, Contract procedures (Federal Highway Administration), text up to date as of · Tier 1 · official · Verified

    Where in the document

    Section 635.104(a), (c), (d) and (e); section 635.110(b), (c) and (f), with (f)(1) and (f)(2); section 635.112(b), (d) and (f). Read through the eCFR versioner API (sections 635.104, 635.110, 635.112, date 2026-10-28); last amended 2020-11-16 (635.104, 635.110) and 2023-03-30 (635.112). For C-3613 (how-road-authorities-buy-works): section 635.110(c), third sentence, 635.110(d) and 635.110(f), opening sentence. Address: the eCFR renderer API’s point-in-time text as of (the title’s “up to date as of” date on 2026-10-30), chosen because it answers plain requests; the human-readable eCFR page, https://www.ecfr.gov/current/title-23/chapter-I/subchapter-G/part-635/subpart-A, sends automated requests (and the coordinator’s browser) to a bot-verification page, which is not bypassed. GovInfo’s annual CFR edition was not used: the eCFR’s dated text is the one every row was checked against, and one address type serves every regulation the guide buy-america-dbe-federal-aid cites.

  16. 16

    Office of the Federal Register and Government Publishing Office, eCFR: 23 CFR 172.7, Procurement methods and procedures (engineering and design related services; Federal Highway Administration), text up to date as of · Tier 1 · official · Verified

    Where in the document

    Paragraph (a)(1), with (a)(1)(i), (a)(1)(ii)(F) and (G), (a)(1)(iii)(B), (C) and (D), and (a)(1)(iv)(D). Read through the eCFR versioner API (section 172.7, date 2026-10-28); last amended 2017-01-03. Address: the eCFR renderer API’s point-in-time text as of (the title’s “up to date as of” date on 2026-10-30), chosen because it answers plain requests; the human-readable eCFR page, https://www.ecfr.gov/current/title-23/chapter-I/subchapter-B/part-172/section-172.7, sends automated requests (and the coordinator’s browser) to a bot-verification page, which is not bypassed. GovInfo’s annual CFR edition was not used: the eCFR’s dated text is the one every row was checked against, and one address type serves every regulation this guide cites.

  17. 17

    Department of Transportation, Office of the Secretary: Disadvantaged Business Enterprise Program and Disadvantaged Business Enterprise in Airport Concessions Program Implementation Modifications, interim final rule, 90 FR 47969, (Federal Register via GovInfo) · Tier 1 · official · Verified

    Where in the document

    Summary and dates (p. 47969: “This IFR is effective October 3, 2025”); section-by-section, items 8 and 9 on 26.51(h) and 26.55(i) (p. 47972); amendatory instructions 23 and 24 (pp. 47981–47982).

  18. 18

    Department of Transportation, Office of the Secretary: Disadvantaged Business Enterprise and Airport Concession Disadvantaged Business Enterprise Program Revisions, final rule, 91 FR 60885, (Federal Register via GovInfo) · Tier 1 · official · Verified

    Where in the document

    Summary (“With few modifications, this final rule follows the interim final rule (IFR) published on October 3, 2025”) and dates (“This rule is effective September 25, 2026”), p. 60885; background, p. 60886; section III.8, Goal Setting and Counting, comments and DOT response, p. 60890; section III.12, the reevaluation deadline, p. 60894; amendment 9 to 26.111, p. 60900. The Federal Register’s own page refuses plain requests; GovInfo serves the official edition.

ListingMinds uses primary procurement, regulatory and contracting sources wherever available. How we work

How to cite

ListingMinds, “Buy America and DBE: how federal money sets the rules on US transport bids”, . https://www.listingminds.com/transport/guides/buy-america-dbe-federal-aid